Total Pageviews
Sunday, March 30, 2014
Sunday, March 16, 2014
The Devil Always Lurks Within The Detail
Forget this dictum, and the devil will be
ever-ready to haul all our arses back to hell. And this is exactly what has bedeviled
the Barak-2 LR-SAM programme of the MoD-owned Defence Research &
Development Organisation (DRDO). And what has led to this rather expensive and time-consuming comedy of errors (about
which I had known since 2011, but am revealing it all only now) being enacted
is nothing else but the sheer lack of managerial skills of India’s present-day Defence Minister, Arakkaparambil Kurian
Antony.
It may be recalled that India and Israel
had inked the 70km-range Barak-2 naval LR-SAM’s joint five-year R & D
contract—valued at US$556 million—on January 27, 2006, following 17 months of
exhaustive contractual negotiations. For extended ground-based long-range air
defence India’s Cabinet Committee on National Security (CCNS) had on July 12,
2007 approved a $2.47 billion project to co-develop the LR-SAM’s 110km-range variant
for the Indian Air Force. Subsequently, on February 27, 2009 India signed a
$1.4 billion procurement contract with Israel Aerospace Industries (IAI) for
the Barak-2’s IAF-specific LR-SAM variant, and this was followed in April the
same year by a $1.1 billion contract for procuring the Barak-2’s naval LR-SAM
variant. Both variants were to have been co-developed by a consortium of
entities that included the DRDO’s Hyderabad-based Defence Research &
Development Laboratory (DRDL), Hyderabad-based Research Centre Imarat (RCI) and
Advanced Systems Laboratory (ASL), and the Bangalore-based Electronics R &
D Establishment (LRDE); plus Bharat Electronics Ltd (BEL) and Bharat Dynamics
Ltd (BDL) on one hand; and a consortium of IAI’s MLM and ELTA Systems business
divisions, RAFAEL and RADA Electronics. The LR-SAM’s critical design review was
completed by early May 2008 and its DRDL-developed two-stage pulsed rocket
motor was successfully test-fired earlier the same year. The first six sets of
these rocket motors were shipped to RAFAEL by the DRDL in July 2008 for further
test and integration activities. Series production was due to have begun in
2011 at the Hyderabad-based facilities of BDL.
Now, it so happened that during the contractual
negotiations stage between IAI, RAFAEL and RADA on one hand and the MoD and DRDO
on the other, the DRDO had ‘assumed’ that the Israeli OEMs would deliver fully
integrated Barak-2 area air-defence weapon systems to the DRDO, which in turn would
supply them to the Indian Navy (IN) through BEL and BDL. However, by 2012 it
had become evident that the DRDO’s ‘assumption’ had in fact, morphed into the
mother of all fuck-ups. And here’s why: the DRDO had wrongly assumed that the
Barak-2 suite, comprising both the LR-SAM rounds and the 9-tonne, mast-mounted ELTA
Systems-developed EL/M-2248 MF-STAR S-band volume-search active phased-array
radar (APAR), would be fully integrated with the EMDINA Mk2 combat management
system, or CMS (developed by the IN’s Weapons & Electronics Systems
Engineering Establishment, or WESEE) on
board the three Project 15A guided-missile destroyers (DDG). In reality, since
the Barak-2’s risk-sharing co-development effort was solely DRDO-led-and-driven
from the Indian side, the DRDO never even bothered to seek WESEE’s feedback
regarding systems integration challenges and taskings, and consequently—believe
it or not— what the MoD-approved joint R & D contract between the India and
Israeli military-industrial consortiums specified on paper only pertained to
integrating the LR-SAM rounds with the MF-STAR’s fire-control systems, and
never addressed the need for integrating this fire-control system with the
EMDINA Mk2 CMS.
Consequently, the WESEE, which since the
late 1980s had designed and developed, along with Russia’s St Petersburg-based
Northern Design Bureau and SUDOEXPORT FSUE, the BEL-built EMCCA computer-aided
action information system (CAAIS) for the three Project 16A FFGs and three Project
15 DDGs, the BEL-built EMDINA Mk1 CMS for the three Project 17 FFGs and four
Project 28 ASW corvettes, was tasked by the MoD to only develop the applications
software of the BEL-built EMDINA Mk2 CMS, plus help the MoD-owned Mazagon Docks
Ltd design and fabricate the 9-tonne main mast housing the MF-STAR for the
three Project 15A DDGs. Therefore, no responsibility was contractually fixed (by
the MoD in its all-knowing wisdom) on who should integrate the Barak-2 suite
with the EMDINA Mk2 CMS. As matters now stand, development of systems integration software began in
only late 2012 after a supplemental R & D contract was inked between the
WESEE and the Israeli military-industrial consortium, and the final end-product
will not be available for in-country firing trials till late 2015.
So why did things go so horribly wrong? There
are two reasons for that. Firstly, the MoD’s existing discredited practice of maintaining
two separate files—the Service File (owned by the concerned armed
services HQ) and the Ministry File (owned by the MoD’s civilian component) for each procurement project, and between which the latter is always the only one that is considered sacrosanct
and is the only one that makes its way to the CCNS for final approval, needs to
be done away with post-haste. Instead, joint accountability for every
procurement decision-making process must be enforced so that the concerned
Project Director from the concerned armed services works together with the concerned
Joint Secretary of the MoD as an embedded team, instead of functioning within administratively
isolated cubicles as is presently the case.
Secondly, the DRDO, apart from approaching
the IN for learning the art of contract negotiations of a military-industrial
nature, should also have invested in acquiring a trials vessel on board which
both the Barak-2 LR-SAM suite should have been integrated with the EMDINA Mk2 CMS
and subjected to a series of developmental firing-trials at sea. Only after the
successful completion of such sea-trials and their validation by the WESEE
should a series-production indent have been placed by the MoD with the Indian
and Israeli military-industrial consortium. One can now only hope that valuable
lessons have been learnt by the MoD and DRDO and history won’t be allowed to
repeat itself on board the four Project 15B DDGs and seven Project 17A FFGs.
Creating Comatose Institutions
Creating Comatose Institutions
Another cardinal sin committed by RM A K
Antony has been his total inability to transform the HQ of the Integrated
Defence Staff (IDH) to the Chiefs of Staff Committee (COSC) in to a functional
institution. While the IDH should have been instructed and empowered by the MoD
to introduce an element of discipline in the military procurement system (such as
coordinating the procurement of LUH helicopters for the Army, IN and the IAF,
and procurement of the combined package of 15 Boeing CH-47F Chinook heavylift
helicopters and 145 BAE Systems-built LW-155 ultralightweight 155mm/39-cal
howitzers), it can do very little since the officer heading the IDH, the Chief
of the Integrated Defence Staff (CISC), is a three-star officer and is therefore
junior to the four-star armed services chiefs. A brief explanation of the IDH
and the CIDS will help appreciate the procurement process better. Following the
Group of Ministers’ report released in February 2001, it was agreed that whle
the institution of the Chief of Defence Staff (CDS) would be the primary step
in the structural reforms suggested for the MoD, the appointment of a Vice-CDS
was instead created within weeks. But as the post of the CDS was soon opposed
by the then Parliament’s Select Committee on Defence, the appointment of the
Vice-CDS became untenable (vice to whom?). Finally, the Vice-CDS’ office was
renamed and the CIDS to the COSC (CISC) came into being in September 2001. The
CISC, who heads the IDH, now has two responsibilities: he is answerable to the
MoD like any other Secretary in the MoD; and on the military side he is
answerable to the Chairman of the COSC. Unfortunately, there are two
fundamental limitations to both these roles. For, unlike the four Departments
of the MoD—Defence, R & D, Production & Supplies, and Finance—the IDH
has not been designated as the MoD’s fifth Department, and hence its activities
are not coordinated by the Defence Secretary.
The reason for this is that while the
armed services personnel could theoretically be posted within the MoD, a
civilian cannot be expected to understand and do the armed services personnel’s
job. Consequently, the CISC at present essentially remains answerable only to
the COSC, and has little or no reason to report to the Defence Minister. Within
the COSC, the individual armed service chiefs remain more aligned with their
service needs than with the common causes, and there is always dissonance
between the purple team (comprising the IDH with officers from the three armed
services) headed by the CISC, and the COSC. This shortcoming can only be
overcome with the appointment of the CDS, who is senior, and hence does not
report to the COSC. The CDS would then become a voting member of the COSC and
in that capacity he would provide single-point military advice to the Defence
Minister and the CCNS. Therefore, had the three four-star armed service chiefs been
instructed by A K Antony to work together to support the creation of the post
of CDS, there would have been no need for them to individually and persistently
explain to the Prime Minister’s Office and his National Security Adviser (who
by the way needs to have a serving three-star military officer as a Deputy
National Security Adviser) the five cardinal truths about national security,
and by now the DRDO would have become far more accountable since, fearing
technical audits of its diverse R & D projects, it would have ended its
skullduggery—one example of which is its proposal to indigenously develop a
155mm/52-calibre ATAGS towed howitzer for the Army, while conveniently
forgetting to hold consultations with the IN, which requires turret-mounted
155mm howitzers to serve as the main artillery armament for its future warship
acquisitions.
A prime example of wasted opportunities due
to sheer mismanagement of both the MoD and the IDH concerns the procurement of
CH-47F Chinooks and LW-155 howitzers. While the Indian Army had by 2006 zeroed
in on the need for air-portable ultralightweight 155mm/39-cal howitzers and had
even drafted a GSQR for its procurement, the IAF, taking a cue from the Army,
too finalised its ASQR for heavylift helicopters required for airlifting such
howitzers by 2007. At this point in time itself, it should have become obvious even
to someone with below-average IQ that irregardless of which howitzer would be
ordered (the LW-155 or the Pegasus from Singapore’s ST Kinetics), the only
available heavylift helicopter that is certified to airlift both these
howitzers in an underslung configuration is the CH-47F—meaning while the
howitzer could be selected after a competitive bidding process, the helicopter
would have to be procured under a sole-source contract. This in turn meant
that, in order to avoid corrupt practices while procuring the CH-47F, it was
preferable to order the 15 CH-47Fs not by the direct commercial sale route, but
via the US Foreign Military Sales (FMS) route. Instead, exactly the opposite
was allowed to happen, i.e. Boeing and Russia’s Rosoboronexport State Corp were
invited to: present their commercial bids in July 2009; and send their
respective platforms—CH-47F and Mi-26T2—to India for in-country flight-trials
on a no-cost-no-commitment basis. At the same time, the MoD conveniently forgot
to coordinate matters with IDH and the COSC for the sake of killing two birds
with one stone, i.e. requesting BAE Systems and ST Kinetics to send the LW-155
and Pegasus to India so that the Army and IAF could create a combined
evaluation team for conducting competitive firepower/mobility evaluations in
which both the CH-47F and Mi-26T2 too could have participated.
Another option that could have been
pursued by the MoD via the IDH was to ensure that both the CH-47F and LW-155
were available in India for field-trials in February 2009 so that the CH-47F
which had been ferry-flown to Bengaluru earlier that month for giving flying
demonstrations at the Aero India 2009 expo, would subsequently be available for
demonstrating the LW-155’s air-portability to both the Army and IAF. However,
all this was not to be.
Consequently, this is how matters played
out in a dysfunctional manner: while both Boeing
and Rosoboronexport State Corp submitted their respective proposals to the IAF in
October 2009, the MoD’s Defence Acquisitions Council (DAC)
cleared the proposal for buying 145 LW-155s for $660 million on only May 11, 2012
through the FMS route (even though Army HQ had forwarded all paperwork to the
MoD as far back as July 2010 when the LW-155 deal was estimated to cost only Rs.30
billion ($477 million). In addition, an Army ‘maintainability evaluation team’ had
visited the US from February 8 to 25, 2011 to examine the LW-155. However, it was
only on August 2, 2013 that the MoD officially requested the US for the sale of
145 LW-155s, whose price had then escalated to $885 million. Subsequently, the
US Defense Security Cooperation Agency (DSAC) on August 7, 2013 notified the US
Congress of a potential FMS of the LW-155s along with Selex-built laser
inertial artillery pointing systems (LINAPS), warranty, spare and repair parts,
support and test equipment, maintenance, personnel training and training
equipment, as well as engineering and logistics support services and other
related elements of logistics support.
Later that year, when the LW-155 was deployed
to Sikkim for in-country high-altitude firepower/mobility trials, the absence
of the CH-47F was direly felt and consequently, the trials could not be
conducted in the areas specified by the Army due to the absence of in-theatre certified
heavylift platforms. It is due to this reason that the LW-155 was: unable to
demonstrate its direct firing capabilities by day and night; unable to
demonstrate its compatibility with the Army’s Firing Tables; unable to demonstrate
its air-portability in underslung mode; unable to demonstrate its sighting
system at nighttime; and unable to demonstrate its built-in communications
system at high altitudes. The IAF too refused to airlift the LW-155 in
underslung mode with its existing Mi-26Ts in Sikkim. And why did the IAF refuse
to do so? Simply because A) the Mi-26T is not certified to carry this weapon
underslung and consequently the IAF does not have SOPs in place to carry out
such a heavylift operation; and B) the IAF therefore did not have in its
possession the hooks and cables required for rigging the LW-155 to the Mi-26T
in underslung configuration.
Yellow
Journalism Yet Again
In this news-report (http://www.sunday-guardian.com/news/russians-go-slow-sukhoi-fleet-in-trouble),
it has been alleged that 50% of the IAF’s Su-30MKI fleet remains grounded
because of A) multiple cases of repeated failure of Mission Computer-1 and
blanking out of Head Up Displays (HUD) and all Multi-Function Displays (MFD) in
flight since 2012. B) Due to non-availability of facilities for overhaul of
aggregates (aircraft parts), following which the serviceability (availability
for flying) of Su-30MKI is slowly decreasing and demand for Aircraft on Ground
(AOG) items on the rise as of December 24, 2013. C) Due to Russia’s inability to set up
the MRO workshops at HAL’s Nashik-based facility by December 2013, and that
this facility was originally scheduled to overhaul the first Su-30MKI by June
2014. Consequently, five Su-30MKIs are already parked at HAL for extensive
overhaul, and another 15 will be due for overhaul in the current year.
Now, let’s separate fact from fiction.
Firstly, both the Su-30MKI and MiG-29B-12 were originally designed and
certified to log in no more than 120 flight-hours per annum. Despite this, the IAF
has been following Western standards of flight operations by requiring its air
warriors to log in at least 25 flight-hours per month, or about 275
flight-hours every year, or 2,750 hours in a decade. Furthermore, the IAF has
been way behind schedule when it came to service-induction of cockpit procedures
trainers and full-flight simulators for the Su-30MKI. Ideally, such flying
training aids should have been commissioned into service in a progressive
manner since the last quarter of 2002, but this process didn’t commence until
the final quarter of 2009. Now, if 275 flight-hours are logged in by a
Su-30MKI, then within five-and-a-half-years itself it would have reached its
scheduled time-between-overhauls (TBO) of 1,500 hours for both the airframe and
turbofans, while the prescribed Russian timetables call for the Su-30MKI to
approach its TBO after only a decade, i.e. after the Su-30MKI has been flown
for 120 hours every year for at least a decade. What this translates into is
that the HAL-owned-and-operated MRO facility for the IAF’s Su-30MKIs should
have become operational by early 2008 at the latest. Consequently, HAL is
behind schedule by six full years when it comes to commissioning such a MRO
facility.
Now, coming to the issue of the premature
in-flight malfunctions of the Su-30MKI’s ELBIT Systems-built Type 967 HUD,
THALES-developed MFD-55 and MFD-66 AMLCDs, and the DARE-developed and HAL-built
mission computer. Firstly, it must be noted that the malfunctions are not across-the-board
or affecting the entire fleet of Su-30MKIs, but only those airframes produced
for the last tranche of 10i-standard Su-30MKIs and the first tranche of
11i-standard Su-30MKIs. At most, therefore, no more than 40 Su-30MKIs will be
affected by such avionics-related malfunctions. This then brings us to the
probable causes of such malfunctions. Prima facie, there is only one probable
cause: faulty hardware—most likely wiring harnesses or cable connectors. What
has to be established is whether these items came directly from Russian OEMs
(in which case product liabilities will those of Rosboronexport State Corp and
IRKUT Corp) or were they sourced from India-based OEM-licenced vendors. This
can easily be done PROVIDED HAL has its in-house required set of item-specific
test-benches and ATE equipment. As another option, HAL can also make use of ADA’s
test-benches and ATE equipment, while DARE can be approached for replicating a fully-functional
mock-up of the Su-30MKI’s cockpit avionics architecture—since DARE is presently
involved with a similar task concerning the cockpits of the projected Super
Su-30MKI.
But what is most exasperating is that
despite decades of experience in licenced-manufacturing of various types of combat
aircraft of foreign origin, neither the MoD’s Department of Defence Production
& Supplies nor HAL till this day have grasped the need for achieving 100% indigenisation
for the tens of thousands of rotables, consumables and accessories that go into
each aircraft-type. Instead, the focus continues to be on the licenced-production
of airframes through raw materials sourced locally and from abroad. Such a
distortion can only result in an undesirable reliance on foreign OEMs for the
smallest but most critical components, which in turn severely compromises the
IAF’s operational sovereignty over its aircraft/weapons assets.
Lastly, a word on the so-called combat
aircraft fleet availability rates in peacetime. No air force in peacetime boasts
of combat aircraft fleet availability rates of 75%. Such high rates are
mandatory for only flying training aircraft like BTTs, AJTs and LIFTs. In reality,
the availability rate of combat aircraft fleets hovers between 50% and 60%. If
the national security scenario worsens over a period of time, then the
availability rates are increased progressively (as was the case with the IAF in
both 1999 and 2002), depending on the type of conflict envisaged, i.e. limited
high-intensity conflict confined to a single theatre, or a full-blown all-out
war. In case of the latter, fleet availability rates are jacked up to 90% for
Day-1 of the war. By Day-2, the rate drops to 75% and by Day-4, the availability
rate stabilises at 50% while ensuring a high tempo of daily sortie generation.
It is based on such estimates that any self-respecting air force does its force-structure planning.
Tuesday, March 4, 2014
The Blind Leading The Blind
This is what ‘desi’ broadcast TV
channels like HEADLINES TODAY have been practicing over the past 48 hours. For
instance, certain news-anchors of this channel have claimed that “all existing Type 877EKM Kilo-class
SSKs are in a decrepit state, they are not seaworthy, that most of their 25-year
shelf-lives and life-cycles are over,” and therefore they are all “floating
coffins”. Facts, however, tell another story altogether. For, it is
downright criminal to claim that these SSKs are using batteries with expired
shelf-lives. In the case of INS Sindhuratna S-59, which recently underwent an unscheduled short-refit, it was using the 240 units of batteries (costing Rs.11 crores in
all and possessing 40% of residual life) that had been removed from INS
Sindhukesari S-60 since the latter is presently undergoing a short-refit.
To date, all eight surviving Kilo-class SSKs
use batteries made by EXIDE Industries and such batteries, in production since
the early 1990s, have also been exported to Algeria and Iran. EXIDE also supplies batteries for the four IN-operated Class 209/Type 1500 SSKs.
About five years ago, another
India-based battery manufacturer—HBL Power
Systems Ltd (see http://www.hbl.in/defence.asp)--which by then was already supplying batteries for IN-owned torpedoes of Russian and
Italian origin as well as for all DRDO-developed tactical and strategic
missiles, approached Indian Navy HQ and requested it to certify its newly-developed submarine batteries
for usage. When IN HQ refused, HBL filed a case in the Delhi High Court against
the IN. The Ministry of Defence (MoD) then told Justice Katju (who was then
hearing the case) that since the IN already had a long-term contract with EXIDE
for procuring submarine batteries, it will not consider a competitive procurement
scenario. Furthermore, since the IN had only a single set of batteries on hand
that was meant for installation on board INS Sindhurakshak S-63 (which was then
due to proceed to Zvezdochka State Machine-Building Enterprise at Severodvinsk
for her medium-refit), it could not spare this set for the sake of holding
competitive field evaluation trials along with the set of batteries built by
HBL. Justice Katju, however, stated that this was simply not on and
consequently ruled in favour of HBL. The MoD then filed an appeal with the
Supreme Court against the Delhi High Court’s ruling and argued that any delays
encountered in the delivery of batteries meant for INS Sindhurakshak will only
severely compromise national security. Fortunately for the MoD, the Supreme
Court quashed Justice Katju’s earlier ruling and delivered a verdict in favour of
the MoD, much to the IN’s relief.
Coming now to the present-day state of
the eight surviving Type 877EKM SSKs, Russia’s Rubin Central Design Bureau for Marine Engineering has confirmed to me that the authorised total technical
service life of each such SSK is not 20 years or 26 years as has been claimed
by several retired IN officials over the past few days, but 35 years.
Furthermore, each such SSK undergoes only one medium refit (inclusive of a
mid-life upgrade) once after completing 13 years of service, and on its 26th year in
service, it will undergo a service life-extension programme (SLEP) or a long-refit (inclusive of further upgrades) so that
it will remain in service for a total period of 35 years.
INS Sindhughosh S-55, whose keel was laid
on May 29, 1983, was launched on July 29, 1985 and was commissioned on November
25, 1985 and it was subjected to a medium-refit and was also upgraded to
Project 08773 standard between 2002 and 2005. INS Sindhudhvaj S-56, whose keel
was laid on April 1, 1986, was launched on July 27, 1986 and was commissioned
on November 25, 1986. INS Sindhuraj S-57, which was commissioned on September
2, 1987, was subjected to a medium-refit and was also upgraded to Project 08773
standard between 1999 and 2001. INS Sindhuvir S-58, which was commissioned on
December 25, 1987, was subjected to a medium-refit and was also upgraded to
Project 08773 standard between 1997 and 1999. INS Sindhuratna S-59, which was
commissioned on August 14, 1988, was subjected to a medium-refit and was also upgraded
to Project 08773 standard between 2001 and 2003. INS Sindhukesari S-60, which
was commissioned on October 29, 1988, was subjected to a medium-refit and was
also upgraded to Project 08773 standard between 1999 and 2001. INS Sindhukirti S-61,
which was commissioned on October 30, 1989, has been declared as a writeoff.
INS Sindhuvijay S-62, which was commissioned on October 27, 1990, was subjected
to a medium-refit and was also upgraded to Project 08773 standard between 2005
and 2007. INS Sindhurakshak S-63, which was commissioned on October 2, 1997, was
subjected to a medium-refit and was also upgraded to Project 08773 standard between
August 2010 and January 2013INS. Next in
line for a medium-refit and upgrading to Project 08773 standard by the Zvezdochka State Machine-Building Enterprise is INS Sindhushastra S-64, which was commissioned on May 16, 2000.
Between 1997 and 1999, INS Sindhuvir was
retrofitted with the LAMA-EKM AICS integrated console and the PIRIT control
system, along with a loop antenna for VLF communications that was sourced from
France’s NEREIDES. These were also installed on board INS Sindhuratna between
2000 and 2002, in addition to the Apassionata-EKM.1 integrated navigation
system (using SAGEM's SIGMA 40 RLG-INS) and the Calibre-PLE fire-control system
associated with the Club-S family of precision-guided munitions (3M-14E land-attack
cruise missile and 3M-54E anti-ship cruise missile).
Between 2002 and 2005, INS
Sindhughosh incorporated all of the above, plus the DRDO-developed and BEL-made
USHUS cylindrical-array bow-mounted sonar, CCS Mk2 composite communications
system and a SIRS radiation monitoring system). Between 2005 and 2008, INS Sindhuvijay
incorporated all of the abov e-mentioned enhancements along with a DRDO-developed
and BEL-built ‘Porpoise’ ESM suite, MCA external antenna, York-built cooling
machines, WAAS-built C-310 torpedo countermeasures and their BDL-built
dispensers, and Sulzer-built high-pressure air compressors). An identical
fitment was carried out on INS Sindhurakshak (containing 12 India-origin
systems installed) between 2010 and 2013 by Zvezdocka,
which deployed more than 200 workers in three shifts to complete each of the
refits in two years.
Thus, of the five Type 877EKM SSKs upgraded so far to Project
08773 standard at an aggregate cost of Rs1,560 crore (or an average of US$156 million per unit),
four of them were armed with 3M-14E and 3M-54E missiles.
For helping the IN’s naval dockyards to undertake
the periodic short-refits, SUDOEXPORT has facilitated and overseen the ToT to
several India-based MRO companies, some of which are highlighted below.
INS Sindhukirti was ripped open in 2004
without Russian approval/licence by the Vizag-based Hindustan Shipyard Ltd
(HSL). While that was the easy part, putting it back together was far more
complex and beyond the capability of HSL. By 2008 the INS Sindhukirti had
become the IN’s ‘dry-dock queen’. HSL had signed a contract on October 3, 2006
with IN for the medium-refit plus upgrade of this SSK. In this regard, contracts
were concluded with Rosoboronswervice India and SUDOEXPORT for material supplies
as well as for turn-key modernisation works. As per the planned schedule, HSL was to have: completed the
SSK’s degutting by May 2007, completed blasting on the entire hull structure
for defect survey by February 2008, completed the removal of hard-patches from all six compartments, commissioned two pipe-bending machines,
completed qualifying HSL’s welders to take up repairs on hull structures, and
receive all related technical documentation from Russia by May 2008. Officially,
INS Sindhukirti, for whose medium-refit plus upgrade the IN had already paid Rs650
crore, was to re-enter service back in 2010. But till this day the medium-refit
work—where the SSK is stripped of all equipment, her hull inspected for
wear-and-tear and machinery replaced—awaits completion and the IN therefore has
classified this SSK as a permanent writeoff.
As part of the SLEP for the remaining
eight Type 877EKM SSKs, the IN in future plans to equip them with thin-line
towed-array sonars as well as new-generation optronic periscopes.
The IN’s Class 209/Type 1500 SSKs were
ordered on December 11, 1981. The first two SSKs (S-44 Shishumar and S-45
Shankush) were built by HDW and were inducted into service in September and November
1986, respectively. The remaining two (S-46 Shalki and S-47 Shankul) were
licence-built by MDL and entered service in February 1992 and May 1994.
All four SSKs subsequently underwent mid-life
refits from 1999 to 2010 during which they were equipped with ATLAS Elektronik’s
ISUS-90 combat management system, CSU-90 cylindrical active/passive bow-mounted
sonar, passive planar flank arrays and intercept arrays (for providing warning
against approaching torpedoes), passive ranging array, a three-dimensional mine
and obstacle avoidance sonar; along with Alenia Sistemi Subacquei’s C-310
submarine-fired torpedo decoy dispensers and a self-noise monitoring system.
The hunt is now on for reelable thin-line towed-array sonars, optronic periscopes
and anti-ship cruise missiles to be installed on board the four SSKs when they
undergo SLEP so that their service-lives will be extended for enabling them to
remain in service till 2025.
Thus, while the IN will by 2018 be able
to muster eight Project 08773 SSKs and retain the last of them in service will
2027, the last of the four Class 209/Type 1500 SSKs will remain in service till
2029.
Let us now turn to the issues of SSK
availability by factoring in the SSK deployment-cycles that are equally divided
between periodic repairs at port, sea-trials and actual operational patrols. It
is estimated that of the 13 submarines presently available to the IN (inclusive
of the INS Chakra SSGN), no more than eight are available during peacetime as
of now. This is woefully inadequate when one takes into account the steadily
increasing operational tempo of the IN’s undersea warfare arm since the late
1990s. For, till the early 1990s, the SSKs—aided by LRMR/ASW platforms like the
Tu-142M—undertook patrols only for: monitoring the twice-a-year naval exercises
conducted by the navies of Pakistan, monitoring the movements of out-of-area
naval warships belonging to the US and China, and taking part in twice-a-year
naval exercises conducted by the IN’s eastern and western fleets. Since the
late 1990s, however the scope of surveillance missions to be undertaken have increased
manifold in order to monitor: the supply of WMD-related
hardware by sea from China and North Korea to Pakistan and Iran, the movements
of the PLA Navy’s various task-forces that have been deployed to the Horn of
Africa for conducting anti-piracy escort missions since 2007, and the annual
exercises conducted by the expanding navies of Bangladesh, Myanmar and
Pakistan. In addition to all this the IN’s submarine arm has to be
committed to various annual bilateral exercises that it now routinely conducts
with the navies of the US, France, the UK, Indonesia, Japan and Singapore and
on top of all this are the two of the IN’s own exercises conducted every year.
To cope with all this is clearly beyond the capabilities of the eight SSKs that
can be spared for such a hectic operational schedule. And this is why the IN
desperately the six Scorpene SSKs and in the longer term, no less than 12 SSNs.
Subscribe to:
Posts (Atom)